Talent Profile Basic Information | |
---|---|
First Name: | Chukwuemeka Joshua |
Resume: | |
Status in Canada: | Work Visa |
Qualifications | |
Licenses: | • Traffic control person •Fall protection •Occupational First Aid & CPR• Site Ready BC and WHMIS 2015 |
Certifications: | Project management Professional |
Skills: | • MS-office • Blueprint Reading • Installations and Assembling • Heavy equipment operation- Packer • Fall protection • First Aid and CPR • Scaffolding Assembly • Driving • Traffic control person Ticket |
Job Preferences | |
Employment Type: | Seeking Full Time Employment |
Availability: | 08/08/2024 |
Willing to Travel?: | Yes |
Willing to Relocate?: | Yes |
Work Experience (OPTIONAL) | |
Employer Name: | Teare Creek Contractors Ltd- Prince George BC, Canada |
Location: | Prince George BC |
Start & End Dates: | June 2024 |
Job Description: | ● Assisted with the transportation and operation of equipment and heavy machinery used in construction projects. ● Handled the loading and unloading of construction materials, tools, and equipment. ● Operated heavy construction equipment ● Assemble and dismantle concrete forms, scaffolding, ramps, catwalks, shoring, and barricades at construction sites as required. ● Cleared construction sites of rubble and debris by utilizing rakes, shovels, wheelbarrows, and various equipment. ● Controlled traffic and placing traffic signs where necessary. ● Ensured pipes are properly aligned and carry out necessary tasks for pipeline installation. |
Postion Title (2): | Construction Supervisor |
Employer Name (2): | Seven-up Bottling Company Ltd. |
Location (2): | Lagos, Nigeria |
Start & End Dates (2): | Jun 2017 - May 2024 |
Job Description (2): | ● Worked in collaboration with the chief project manager to define project goals, establish timeline, change management procedure, budgets and plans to completion of the $250 million (USD) projects. ● Reviewed designs, plans and reports to ensure constant compliance with project specifications ● Coordination and/or facilitation of key meetings or review points: project kick-off meetings, P&IDs review, constructability review, 3D model reviews, construction kick-off, etc. and following all action items through to completion ● Saved project costs by meeting deadlines and coordinating with contractors to manage performance. ● Crafted project documentation including work order cards, method statements, construction plans and risk assessments. ● Prepared plans for commissioning of production line and utilities equipment and systems ● Coordinated with cross-functional teams to resolve project issues and mitigate risks exposure by 20%. ● Maintained 0 to 1% lost man-hours in 5 years by complying with OSHA safety standards. ● Managed project changes by recommending improvements for design, construction and materials based on field or changing conditions. ● Led meeting and report presentations in project stakeholder engagement |